Move the piece as necessary so one end extends 16 inches beyond the lower corner of the roof at one side.
Roof edge metal install.
Install sheet metal drip cap over the lower rim.
Position a piece of 2 by 2 inch metal roof edge at the lower edge of the roof with the beveled side against the.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
This will allow for expansion and contraction and prevent buckling.
Most metal shingles will be attached to the roof using metal shingle.
Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails.
The three piece snap on system helps improve rooftop productivity and offers exceptional performance.
Perimeter edge metal training and education take advantage of industry leading training and education though care the center for the advancement of roofing excellence.
Metal era manufactures engineered roof edge solutions that are easy to install and stand the test of time.
Learn how we can help on your next building project.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Place the piece of edging on.
The extension should be at least inch for it to work.
Omg terminedge is an easy to install ansi spri fm 4435 es 1 tested and fm approved fascia system for virtually any commercial roofing assembly.
How to install a metal roofing edge 1.
You may need to nail through the starter strip into the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.
Slide the corner tight to the fascia.
Insert the wide flank of drip cap underneath the first course of shingle or tile all the.
Take care the first piece is aligned precisely perpendicular square to the edge.
Place a nail at one end then the other.
Use your neoprene washer head screws to secure the metal to the sheathing.
All five terminedge options provide superior protection from wind and water penetration.
Here is a short video showing how.
Do you need to install eave or fascia for a metal roof.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Install the starter course.