Panel length per slope that will provide adequate drainage.
Roof panel construction details.
Also for exposed fastener panels wall panels tiles soffit fascia copping.
Paint or prime cut edges to prevent rust.
Hori zontal panel lap joints are not acceptable.
The structural insulated panel association sipa is a non profit trade association representing manufacturers suppliers dealer distributors design professionals and builders committed to providing quality structural insulated panels for all segments of the construction industry.
Please click on the circled section of the typical building to view its details.
Roof clips shall allow for thermal movement and shall be installed at each panel joint.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
475 east 4th st.
Epdm closures and metal top closures shall be caulked around their entire perimeter.
Take care the first piece is aligned precisely perpendicular square to the edge.
By amerimax 73 37 63 carton.
Universal ridge flashing in charcoal.
Metal roofing specifications cad pdf drawings testing bim.
Project panel corrugated 3 ft.
Wear hearing and eye protection.
Most panels come up to 32 feet 9 8 m in length.
Free delivery with 45 order.
Step 1 cut the panels to the desired length.
Add the metal panels.
By metal sales.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
If a sheet must be bent a gentle 90 degree bend is the maximum recom mended.
Angle grinder 1 x research source the fastest option.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
Box 435 cottonwood mn 56229.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
For longer slopes and lower roof pitches contact fabral for other suitable profiles.
If yours do not.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Always begin working at the point with the longest peak to eave distance.
The roofing fascia soffit system shall be installed plumb straight and true to adjacent work.